Eggins.com
Powershell, .Net, Visual Studio, Team Foundation Server, Windows Communication Foundation

Renovation - End of Week 23

 


The wires for the deck railing have now been installed. They look so awesome! There is a lot of them, due to the new regulations. here is no way kids will fall through them. The look is fantastic. 

 


The deck roof is taking shape. Just about ready for the laserlite sheeing. Matt and Tom have done a great job with this roof. The space is huge.


The left picture is of the ensuite ceiling, with the hole cut for the IXL Tastic (Fan, heater, and light). The right picture is of the newly painted rear sliding door and laundry area. The tinted wood has ended up a good match for the old wood in the house. And the paint job is great. Very light compared to the old colour.


These pictures are of the newly painted lounge room. It looks great. I cannot wait to get the carpet in there so we can start using the room.


The roof access ladder has been installed. It is such a great idea. Very easy access to the roof for some storage, and seeing where the possums are getting in! 

We are very nearly completed nost of the build now. After the deck roof is done and the final electrical work, the builders will move onto gutting the old bathroom and toilet, and rebuilding them as one room in a new floor plan. I have to organise the carpets and kitchen floor coverings. 


Posted Aug 28 2007, 11:58 PM by David

Comments

david eggins wrote re: Renovation - End of Week 23
on 01-03-2008 9:12 PM

I typed my name David Eggins into our computer to see what would come up and I find another David Eggins doing ,amongst other things, a deck and roof just like me.

Add a Comment

(required)  
(optional)
(required)  
Remember Me?
Copyright eggins.com, 1998 - 2008
Powered by Community Server (Non-Commercial Edition), by Telligent Systems